Parts and Service Manual
560R
1. Operation Procedures
2. Service And Management
3. Automatic Grade Control Set-Up
4. Parts Information
Hopper, Conveyor, Auger, Gate Groups | 1-0 |
Bumproll Assembly & Installation | 1-1 |
Rubber Hopper Lip Assembly | 1-2 |
Hopper Side Plate Group | 1-3 |
Conveyor Actuator Arms Group | 1-4 |
Disc Conveyor Assembly & Installation | 1-5 |
Disc Conveyor Motor Installation (left) | 1-6 |
Disc Conveyor Motor Installation (right) | 1-7 |
Hopper Lift Cylinder Installation | 1-8 |
Auger Drive Gearbox Assembly | 1-9 |
Auger Motor Installation | 1-10 |
Auger Group Installation (Right) | 1-11A |
Auger Group Installation (Left) | 1-11B |
Lower Hopper Gate Assembly | 1-12 |
Bottom Gate Cylinder Group | 1-13 |
Side Gate Cylinder Installation | 1-14 |
Gate Linkage Covers | 1-15 |
Screed & Operator Platform Groups | 2-0 |
Crown Adjustmet/Screed Ext. Mechanism | 2-1 |
Screed Extension Drive Group | 2-2 |
Screed Height Adjustment Installation | 2-3 |
Screed Height Adjustmetn Screw Assembly | 2-4 |
Screed Extension Scrapers Installation | 2-5 |
Vibratory Shaft Assemblies | 2-6 |
Vibratory Shaft Assemblies (continued) | 2-7 |
Screed Heater Group (Left) | 2-8 |
Screed Heater Group (right) | 2-9 |
Screed Covers (Left) | 2-10 |
Screed Covers (Right) | 2-11 |
Operators Platform Group | 2-12 |
Propane Tank Assembly | 2-13 |
Platform Lift Cylinders Group | 2-14 |
Engine Group | 3-0 |
Motor Mount Group | 3-1 |
Intake Air Filter Group | 3-2 |
Fuel Tank Assembly | 3-3 |
Fuel Filter Group | 3-4 |
Exhaust Group | 3-5 |
Cooling Hose Group | 3-6 |
Radiator Assembly | 3-7 |
Surge Tank Assembly | 3-8 |
Cooling Fan Group | 3-9 |
Brackets (right rear of engine) | 3-10 |
Hydrostatic Pump Drive Coupling Assmbly & Install | 3-11 |